Manage scene plans
Choose the scene to display
A scene plan is selected by the following combination:
- Date
- Building
- Floor or area
- Time
The initial view uses the next working day's site start time. Project-specific working days take precedence, including long holidays and site-specific non-working days.
Change a placement
When the same machine or vehicle moves during the day, Con-Sight does not create a different asset. Instead, it records another time interval for the same placed object. Changing the displayed time shows the location, orientation, and state valid at that point.
Review differences from the previous working day
Carrying over a previous scene does not confirm changes automatically. Review the differences and choose which items to apply. The initial comparison scope is machinery and security personnel.
Change history
Con-Sight retains edit history while showing the latest state in normal operation. The data model is designed so that a past point in time can be reviewed from the history.
Real-time collaborative editing is planned for a later release. In the beta, unsynchronized changes from multiple devices are not silently overwritten; they are surfaced as a synchronization error.